• "slidebg1" data-bgposition="right center" data-kenburns="on" data-duration="14000" data-ease="Linear.easeNone" data-bgfit="100" data-bgfitend="110" data-bgpositionend="left center"

    Kaiser Permanente Sand Canyon

    Irvine, CA

  • "Background Image"

PROJECT INFO

This Tenant Improvement project required a great deal of pre-task planning and coordination as it was conducted in a fully-operational medical campus with patients both above and below the 4th floor buildout. A disruption in service would be critical to the patients and the owner and would have been unacceptable to our high quality standards.

Pan-Pacific upgraded the 4th floor with an additional 24 beds making the hospital more efficient in patient care. With Pan-Pacific’s knowledge and ultimate care, we were able to perform the required tasks without a hitch.

Pan-Pacific performed Fuel Oil work on the project installing a Pressure Line Leak Detection (PLLD) system to perform precision leak testing at full pressure. PPM designed a program for Kaiser to apply to their existing systems that utilizes code and helps detect catastrophic leaks. Should a leak be detected at a pre-set pressure threshold, the system would shutoff power to the Submersible Turbine Pump (STP) and notify the site operator minimizing environmental damage and preventing a public safety issue. Pan-Pacific’s system includes permitting with local agencies, OSHPD coordination, overall install wiring and interconnecting panels on specific sites.